PMC经理英文个人简历范文
01-01 20:01:03浏览次数:316次栏目:英文简历
标签:英文简历模板,英文简历范文,英文个人简历,暂无联系方式
PMC经理英文个人简历范文,
生产计划英文个人简历范文原文 查看生产计划英文个人简历范文中文翻译参照
Resume number: |
474383302 |
Updating date: |
2009-05-24 17:16:28 |
no photo
|
Name: |
Mr. Standy Wu |
Nationality: |
China (Mainland) |
Current Place: |
Shenzhen |
Height/Weight: |
168 cm56 kg |
Marital Status: |
married |
Age: |
34 years |
Application type: |
Jobseeker |
Preferred job title: |
Production Plan/Product Material Control:
PMC Manager
、
Production Plan/Product Material Control:
Material Manager
、
:
|
Working life: |
13 |
Title: |
No title |
Job type: |
Full time |
Expected Start date: |
In a month |
Expected salary: |
¥12,000--¥20,000 |
Preferred working place: |
Shenzhen
|
Company's name: | Johnson Electric Group (ShenZhen) LtdBegin and end date: 2006-04- |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment |
Job Title: | PMC Manager | Job description: | 1.) Lead the overall Materials,Planning and Logistics operations in IPM BU in achieving best in Material and Planning related performance. Oversee all aspects of Material and Planning functions including material planning, inventory, w/h operations, order management, production scheduling, capacity planning, freight and delivery.
2.) Communicate with marketing/sales dept for forecasting to optimize manufacturing resources to ensure sales demand can be met;
3.) Identify and implement inventory management strategies and procedures to manage the materials flow to ensure all activities and materials are being tracked and monitored to meet corporate goals. And drive inventory levels down to an acceptable level to meet targets.
4.) Oracle ERP system implementation and maintenance.
5.) Implement appropriate HR strategies and actions to recruit and retain a qualified and motivated workforce. Assessment team members' performance, and suggest improvement to help subordinates success. | Reasons for leaving: | |
|
Company's name: | Johnson Electric Group (ShenZhen) LtdBegin and end date: 2003-04-2006-03 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment |
Job Title: | Senior Supervisor - PMC | Job description: | 1.) Lead PMC Dept to achieve annual target, manage Dept overall operation quality and effectiveness; Responsible for material planning, inventory control, capacity planning, production planning and delivery;
2.) Approve Master Production Schedule (MPS), Material Requirement Plan (MRP), monitor KanBan and BTO production operations; Identify inventory control system, asessment and analyze inventory level status, drive inventory down to meet corporate inventory turns target;
3.) Set annual target for PMC Dept, e.g. DCT, OTD, Inventory Turns, FPY, Productivity and Machine Utilization; monitor operation performance (Cockpit chart measurements) and continuously improve. | Reasons for leaving: | |
|
Company's name: | Johnson Electric Group (ShenZhen) LtdBegin and end date: 2000-11-2003-03 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment |
Job Title: | PMC Supervisor | Job description: | Production planning to ensure on-time delivery; material planning and control inventory at acceptable level. | Reasons for leaving: | |
|
Company's name: | VARITRONIX (ShenZhen) LtdBegin and end date: 1999-03-2000-10 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment |
Job Title: | PMC Supervisor | Job description: | | Reasons for leaving: | |
|
Company's name: | VARITRONIX (ShenZhen) LtdBegin and end date: 1996-09-1999-01 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Furniture/Home Appliances/Crafts/Toy/Jewelry |
Job Title: | PMC Planner | Job description: | | Reasons for leaving: | |
|
[1] [2] [3] 下一页
,PMC经理英文个人简历范文